Final bridge beams set in place on M25 junction 28
GRAHAM have announced that it has successfully installed the Duckwood Bridge beams at Junction 28 of the M25, the last set of beams to be installed on the scheme. The complex operation saw six steel girders lifted into place in pairs for Duckwood Bridge, using a 1000-tonne capacity crane. This operation entails bolting together smaller […]