UltraCrete has it covered on Tower Bridge
Ductile access covers manufacturer Eccles, and infrastructure services partner, FM Conway, have used UltraCrete Instagrip anti-skid patch repair to install 660 bespoke ductile iron covers on Tower Bridge in London. The existing access covers weighed over 200kg each making them extremely difficult to lift and to carry out maintenance. What’s more, the new and improved […]
WJ team battle the elements to increase driver visibility on the A2
When improving safety through visibility was identified as a top priority for planned resurfacing work on three sections of the A2, National Highways selected WJ Group to install high performance road studs and markings. The work resulted in the team battling the elements to ensure that drivers could access this vital length of the network. […]
RAC analysis alongside Channel 4’s Dispatches uncovers major disparities in how road defects are actioned by councils
Local authorities are taking wildly differing approaches to deciding whether or not potholes get fixed, meaning many go unrepaired and continue to pose a risk to road users – especially those on two wheels, analysis conducted by the RAC and Channel 4’s Dispatches programme has found. Three-in-10 of the 206 councils in Great Britain with responsibility […]