Bird’s eye view of Black Cat progress as major road scheme reaches halfway point

Newly released drone footage highlights how National Highways’ A428 Black Cat to Caxton Gibbet Improvements are taking shape as the scheme reaches halfway point. Major changes to key locations along the new 10-mile dual carriageway in Bedfordshire and Cambridgeshire have already taken place, including at Black Cat roundabout, Cambridge Road (St Neots), Eltisley and Caxton […]
Black Cat roundabout project costing £1m a day

A road improvement project is costing about £1m a day as it reaches its midpoint. The National Highways scheme is building a 10-mile dual carriageway between the Black Cat roundabout in Bedfordshire and Caxton Gibbet in Cambridgeshire, says the BBC. The aim is to reduce congestion and speed up journey times along the A428, with […]
A428 Black Cat to Caxton Gibbet: Open for business

Skanska’s A428 project team have safely connected the new A428 and B1040 roads over a newly constructed bridge and opened it up to traffic. This signifies the opening up of part of the mainline route of the A428 in Cambridgeshire which is key for moving earthworks material that will form the new western embankment at […]